Updating a condo isn’t the same as updating a house. Strata bylaws, shared walls, elevators, and neighbours above and below all affect how the work gets done. Kiev Home Renovations provide condo renovation in Surrey, BC for owners who want to refresh or rework their unit without running into surprises. We plan the building rules and the renovation together.
Tell us about your unit and what you’d like to change.
Transforming Lower Mainland
Full liability coverage
Covered crews on every site
Standing behind the work
Most of the trouble in a condo project starts outside the unit.
Many strata corporations have renovation bylaws, and some require approval before certain work begins. We raise this at the start so it doesn't stall the project later.
You share floors, ceilings, and walls with other households. We plan noise, dust, and work hours with that in mind.
Elevators, loading areas, and hallways are shared. We talk through deliveries and scheduling before work starts.
Plumbing stacks, ventilation, and structural walls in a condo are often fixed. We find out what's flexible before you fall for a layout.
Send us what you have. Kiev Home Renovations will help you work out what to raise with your strata before any work is planned.
1
We ask about your strata's renovation requirements and what you've been told about work hours, access, and approvals.
2
We look at the layout, finishes, and what's fixed in the unit, then talk through what you want to change. We also look into whether a City of Surrey permit applies to the work.
3
We settle what's being done, which materials you've chosen, and how the work will be scheduled around building limits.
4
The work can include demolition, mechanical updates, drywall, flooring, finishes, and a final walkthrough with you. We coordinate any inspections your permits require.
It depends on the size of the unit, its condition, how much changes, and the materials you choose. Contact us to talk through your condo, and we’ll define the scope needed to price it.
Our projects range from one day to around 60 days for a full home remodel. We’ll set a timeline for your unit once we know the scope. Strata approval, building schedules, and material availability can also affect it.
It depends on your strata’s bylaws and the work involved. Many stratas require approval for plumbing, electrical, or structural changes. Check your bylaws or ask your strata manager, and we’ll help you prepare the scope details they’re likely to ask for.
Yes, they’re different. A strata decision doesn’t replace a permit where one is required. We’ll tell you which approvals to confirm before work starts.
Probably not. Many buildings limit work hours and noise, and some control elevator use. Check your strata’s rules, and we’ll plan the schedule within them.
Sometimes, but not always. Structural walls and shared building systems limit what’s possible. We’ll check your unit and tell you what’s realistic.
It depends on the scope. Some owners stay, others move out for part of the project. We’ll talk through what’s practical for your situation.
Whether you’re updating a single bathroom or planning a larger renovation, a few details about your home and what you’d like to change will help us understand where to start. Tell us about your ideas, priorities, and approximate budget, and we’ll discuss the next steps with you.
Mon - Fri: 08:00 am - 07:00 pm
Sat - Sun: Closed
If your condo needs updating, we’re glad to talk through the plan with you. Tell Kiev Home Renovations about the unit and what you’d like to change.